Opel Vectra B

since 1995 of release

Repair and car operation



Vektr B. Opel
+ 1.1. Governing bodies and control devices
+ 2. Maintenance
- 3. Engines
   + 3.1. Repair of the SOCH engine established in the car
   + 3.2. Repair of the DOCH engine established in the car
   + 3.3. Repair of the diesel engine of 1,7 l established in the car
   + 3.4. Repair of the diesel engine of 2,0 l established in the car
   - 3.5. Major maintenance of engines
      3.5.1. Introduction
      + 3.5.2. Technical characteristics
      3.5.3. Removal and installation of the petrol engine together with a transmission
      3.5.4. Removal and installation of the diesel engine together with a transmission
      3.5.5. Engine repair
      3.5.6. Dismantling of a head of the block of cylinders
      3.5.7. Cleaning and survey of a head of the block of cylinders
      3.5.8. Assembly of a head of the block of cylinders
      3.5.9. Removal of pistons with rods
      3.5.10. Removal of a cranked shaft
      3.5.11. Block of cylinders of the engine
      3.5.12. Pistons and rods
      3.5.13. Cranked shaft
      3.5.14. Survey of radical and shatunny bearings
      3.5.15. Engine balance of assembly at major maintenance
      3.5.16. Installation of piston rings
      3.5.17. Choice of bearings
      3.5.18. Installation of a cranked shaft
      3.5.19. Pistons and rods, check of working gaps of shatunny bearings
      3.5.20. Check of a working gap of the bearing of the bottom head of a rod
      3.5.21. Installation of pistons with rods
      3.5.22. Engine start after major maintenance
+ 4. Heating, ventilation
+ 5. Fuel system
+ 6. Systems of start, ignition
+ 7. Transmission
+ 8. Brake system
+ 9. Running gear
+ 10. Body
+ 11. Electric equipment
+ 12. Main malfunctions


5645d6d1

3.5.8. Assembly of a head of the block of cylinders

PERFORMANCE ORDER
1. Grease cores of valves with engine oil and insert them on the places. The valve establish on those places where they were ground in.
2. Establish a spring nest.
3. Establish the thin-walled protective plug on a valve core.
4. For installation of maslootrazhatelny caps use a special metal opravka.
5. Establish a klapanny spring and a plate of a spring.
6. The special adaptation compress a klapanny spring and establish crackers in dredging of a core of the valve and grease them. Remove the adaptation for spring compression. Repeat this operation on other valves.
7. With a hammer through wooden whetstone knock on an end face of a core of the valve in order that all elements of the valve were accurately established on the places.
8. On the SOCH engine of 1,6 l establish hydraulic pushers, blocks of axial pressure and levers
9. On all petrol DOCH engines establish a head on the block of cylinders of the engine and establish in a head pushers and camshafts.
10. On diesel engines of 1,7 l establish a head on the block of cylinders of the engine and establish in a head pushers, adjusting laying and a camshaft. Establish fuel nozzles and glow plugs.
11. On diesel engines of 2,0 l establish a head on the block of cylinders and establish hydraulic pushers, levers and a camshaft.