Opel Vectra B

since 1995 of release

Repair and car operation



Vektr B. Opel
+ 1.1. Governing bodies and control devices
+ 2. Maintenance
- 3. Engines
   + 3.1. Repair of the SOCH engine established in the car
   + 3.2. Repair of the DOCH engine established in the car
   + 3.3. Repair of the diesel engine of 1,7 l established in the car
   + 3.4. Repair of the diesel engine of 2,0 l established in the car
   - 3.5. Major maintenance of engines
      3.5.1. Introduction
      + 3.5.2. Technical characteristics
      3.5.3. Removal and installation of the petrol engine together with a transmission
      3.5.4. Removal and installation of the diesel engine together with a transmission
      3.5.5. Engine repair
      3.5.6. Dismantling of a head of the block of cylinders
      3.5.7. Cleaning and survey of a head of the block of cylinders
      3.5.8. Assembly of a head of the block of cylinders
      3.5.9. Removal of pistons with rods
      3.5.10. Removal of a cranked shaft
      3.5.11. Block of cylinders of the engine
      3.5.12. Pistons and rods
      3.5.13. Cranked shaft
      3.5.14. Survey of radical and shatunny bearings
      3.5.15. Engine balance of assembly at major maintenance
      3.5.16. Installation of piston rings
      3.5.17. Choice of bearings
      3.5.18. Installation of a cranked shaft
      3.5.19. Pistons and rods, check of working gaps of shatunny bearings
      3.5.20. Check of a working gap of the bearing of the bottom head of a rod
      3.5.21. Installation of pistons with rods
      3.5.22. Engine start after major maintenance
+ 4. Heating, ventilation
+ 5. Fuel system
+ 6. Systems of start, ignition
+ 7. Transmission
+ 8. Brake system
+ 9. Running gear
+ 10. Body
+ 11. Electric equipment
+ 12. Main malfunctions


5645d6d1

3.5.20. Check of a working gap of the bearing of the bottom head of a rod

PERFORMANCE ORDER
1. Clear a back part of the loose leaf and a place of its installation in a rod and a rod cover.
2. Establish loose leaves on the places.
3. One of methods consists in establishing covers of shatunny bearings together with the loose leaf on rods and to screw them the demanded moment. Measure internal diameter of each collected pair of loose leaves of bearings. Measure diameter of each shatunny neck of a cranked shaft. Subtract from the measured diameter of the bearing the corresponding diameter of a shatunny neck of a cranked shaft.
4. The second and more exact method consists in using a product known as for Plastigage. It is a round plastic core which is compressed between the loose leaf and a neck of a cranked shaft. After removal of a cover of the shatunny bearing the deformed plastic core is measured by a special template which is available complete with Plastigage. Procedure for Plastigage use following. Establish without greasing rods on a cranked shaft, necks of a cranked shaft and loose leaves should be absolutely pure and dry. Cut off some slices of a plastic core and establish them on each neck of a cranked shaft. Establish covers with the bottom loose leaves and tighten bolts of fastening the demanded moment.
5. In the course of gap measurement by the Plastigage method do not rotate a cranked shaft of the engine. Unscrew a cover of fastening of the loose leaf, remove it and to the deformed plastic core put the large-scale ruler printed on packing. Comparing width of the deformed plastic core with control width on a large-scale ruler, define gap size. In end carefully clear Plastigage traces – a material from loose leaves and a cranked shaft.